We provided comprehensive external access across the entire building perimeter and roof, designed to accommodate the phased refurbishment programme as it moved through different building zones.
The installation included full external scaffolding for the complete replacement of all window glazing across all nine floors, including new Crittall-style steel windows throughout. Precision access across multiple levels supported the new balustrade installation, coordinated with the internal works schedule to keep trades moving.
At the rear elevation, we installed a 2-tonne beam hoist feeding directly into a 2-tonne goods hoist, creating an efficient material flow system for the volume of glazing, structural steel, and finishing materials the programme required. Three gantries managed ground-level logistics across different building zones, while two lift shaft scaffolds provided internal access for vertical circulation upgrades including new lifts.
Public safety drove our street-level approach. Full pedestrian segregation was maintained on the pavement throughout the 24-month programme, with Shaftesbury Avenue’s foot traffic uninterrupted at every stage.
As the refurbishment progressed through terrace reconstruction across four floors and the creation of over 5,500 sq ft of new outdoor space, the scaffold installation adapted to support each phase. The Curzon Cinema and Bank of China continued trading throughout.